Tunnels and Underground Spaces – N°243 – May-June 2014

20,00 (20,00 Excluding tax)

Articles presented in this issue: A89 East, La Bussière and Chalosset tunnels – Renovation of Dullin tunnel lighting, Feedback on two years’ experience with LED lighting  – Main structures of the Caluire tunnel: fire test – Site visit of the Dunkirk methane, terminal tunnel

Description

  • Edito : Iguassu, the Falls, the fall and bouncing back – Maurice Guillaud
  • Interview – Managing director of the French CETU and Vice-Chairman of ITA-CET – Michel Deffayet
  • A89 East – La Bussière and Chalosset tunnels – Yi Zhang, Alexandre Dougnac
  • Renovation of Dullin tunnel lighting, Feedback on two years’ experience with LED lighting – Jean-Claude Gachet, Dominique Duband, Olivier Martinetto
  • Main structures of the Caluire tunnel: fire test and detailed engineering study for an adapted renovation program – Jérôme N’Kaoua, James Dupont, Frédéric Walet
  • Procédés d’étanchéité innovants – Rappel du contenu de l’Avis d’Experts AFTES – Jean-Louis MAHUET
  • Site visit of the Dunkirk methane, terminal tunnel – Jean Piraud, Yves Menard

Additional information

Author

AFTES

Number of pages

76

Year of publication

2014

Language

English, French

ISSN (EN)

0399-0834

Tunnels and Underground Spaces – N°243 – May-June 2014

20,00 (20,00 Excluding tax)

Add to basket