Basket

    Product PU Quantity Subtotal Tax %
× The design, sizing and construction of precast concrete segments installed at the rear of a tunnel boring machine (TBM) The design, sizing and construction of precast concrete segments installed at the rear of a tunnel boring machine (TBM) 30,00
30,00 0,00 %
× Earthquake design and protection of underground structures Earthquake design and protection of underground structures 30,00
30,00 0,00 %
× Guide for water protection and drainage of underground structures - Booklet 9 - GT9.C9A1 Guide for water protection and drainage of underground structures - Booklet 9 - GT9.C9A1 30,00
30,00 0,00 %

Basket totals

Subtotal HT 90,00
Total TTC 90,00