Tunnels et Ouvrages Souterrains – N° 209 – Septembre-Octobre 2008

20,00 (20,00 Excluding tax)

This issue presents the recommendations of Working Group No. 24: In-progress soil investigation (French version), and contains the following articles:  Ventilation and safety – In-progress soil investigation in theupstream-Salazie hydraulic gallery – Renovation of the Thoraise river tunnel – Contribution of the subsurface to town life – The South tube of the Toulon under-ground crossing

The articles in this issue are not translated, only the abstracts of the articles are translated into English.

 

SKU: TOS-209-FR Category:

Description

The articles in this issue are not translated, only the abstracts of the articles are translated into English.

  • Ventilation and safety: Comparison of European base tunnels – Ch. Rudin, P. Reinke, A. Busslinger, B. Hagenah
  • In-progress soil investigation in theupstream-Salazie hydraulic gallery (La Réunion) – M. Rousseau, Le Petit, J-L. Giafferi, D. Defargues
  • Renovation of the Thoraise river tunnel – N. Dias, J. Triclot, B. Bizon, F. Col, P. Van Der Zwaag
  • Contribution of the subsurface to town life, example of the Val-de-Marne – P. Duffaut, M. Labbé
  • The South tube of the Toulon under-ground crossing. De-dusting and ventilation of the Eastern and Western work sites – François Ceccaldi

Recommendations of WG24 (French version)

  • In-progress soil investigation

Additional information

Author

AFTES

Number of pages

106

Year of publication

2008

Language

French

ISSN (EN)

0399-0834

Tunnels et Ouvrages Souterrains – N° 209 – Septembre-Octobre 2008

20,00 (20,00 Excluding tax)

Add to cart