Basket

    Product PU Quantity Subtotal Tax %
× Diagnosis methods for lined tunnels 1 Diagnosis methods for lined tunnels 30,00
30,00 0,00 %
× Road pavements in tunnels Road pavements in tunnels - GT40R1A1 30,00
30,00 0,00 %
× The design, sizing and construction of precast concrete segments installed at the rear of a tunnel boring machine (TBM) The design, sizing and construction of precast concrete segments installed at the rear of a tunnel boring machine (TBM) 30,00
30,00 0,00 %
× Geometry, concrete mixes, formwork and concrete pouring practice Geometry, concrete mixes, formwork and concrete pouring practice - GT36R1A1 30,00
30,00 0,00 %
× Design of sprayed concrete for underground support Design of sprayed concrete for underground support 30,00
60,00 0,00 %
× Cost control and forms of contract Cost control and forms of contract - GT25R3A1 30,00
30,00 0,00 %
× Method to assist in asset management for underground structures Method to assist in asset management for underground structures 30,00
30,00 0,00 %

Basket totals

Subtotal HT 240,00
Total TTC 240,00