Basket

    Product PU Quantity Subtotal Tax %
× Catalogue of disorders in underground structures Catalogue of disorders in underground structures 30,00
30,00 0,00 %
× Characterisation of geological, hydrogeological and geotechnical uncertainties and risks Characterisation of geological, hydrogeological and geotechnical uncertainties and risks - GT32R2A1 30,00
60,00 0,00 %
× Forward probing ahead of tunnel boring machines Forward probing ahead of tunnel boring machines 30,00
30,00 0,00 %
× A code of practice for risk management of tunnel works A code of practice for risk management of tunnel works - GT39R1A1 30,00
30,00 0,00 %
× Appendix 1 - Geometry, concrete, formwork and concreting of tunnel linings : Construction defects Geometry, concrete, formwork and concreting of tunnel linings : Construction defects - GT36R1A1 Appendix 1 30,00
30,00 0,00 %
× Method to assist in asset management for underground structures Method to assist in asset management for underground structures 30,00
90,00 0,00 %
× Use of explosives : sensitized emulsions pumped directly at the workface Use of explosives : sensitized emulsions pumped directly at the workface - GT3R6A1 30,00
30,00 0,00 %
× Management and use of excavated materials Management and use of excavated materials - GT35R1A2 30,00
30,00 0,00 %
× Earthquake design and protection of underground structures Earthquake design and protection of underground structures 30,00
30,00 0,00 %
× Rail tracks and track beds in tunnels - GT40R2 Rail tracks and track beds in tunnels - GT40R2A1 30,00
30,00 0,00 %
× Grouting for rehabilitation of man-entry underground structures - WG14R5 Grouting for rehabilitation of man-entry underground structures 30,00
30,00 0,00 %
× Quality process in underground engineering Quality process in underground engineering 30,00
30,00 0,00 %
× Geometry, concrete mixes, formwork and concrete pouring practice Geometry, concrete mixes, formwork and concrete pouring practice - GT36R1A1 30,00
30,00 0,00 %
× Design, dimensioning and execution of precast steel fibre reinforced concrete arch segments Design, dimensioning and execution of precast steel fibre reinforced concrete arch segments - GT38R1A1 30,00
30,00 0,00 %
× Contract practice in tunnel construction - Contract for the supply of tunnelling machines Contract practice in tunnel construction - Contract for the supply of tunnelling machines 30,00
30,00 0,00 %

Basket totals

Subtotal HT 540,00
Total TTC 540,00